Ceramacrete served as a durable material for road construction. Much of the road surfaces on Naos III consisted of ceramacrete paving, though it was largely in disrepair. The turbolift shaft situated beneath the lower reaches of the 500 Republica building on Coruscant was constructed from aged and fractured ceramacrete. Ceramacrete also formed the flooring within the Separatist communications facility found on Jaguada's moon.